Construction of a new railway (Phase II) from Farap Station in the Bagtyjiarlyk Contract Area on the right bank of the Amu Darya River in Turkmenistan to the First Natural Gas Processing Plant
Project Introduction:
The first natural gas processing plant in the Bagtyjiarlyk contract area on the right bank of the Amu Darya River in Turkmenistan is a key project of the Amu Darya River project, located in Block A of the Bagtyjiarlyk contract area. The entire processing plant covers an area of nearly 800000 square meters, with 315 kilometers of above ground and underground pipelines. During the construction process, a total of 73000 cubic meters of concrete, 8500 tons of steel structures, 1589 kilometers of electrical and instrumentation cables, 634 sets of large equipment, and 15000 sets of other equipment were used.
The Amu Darya River project will become the main gas supply source for the West East Gas Pipeline 2. Together with Turkmenistan's natural gas Kangcaien, it will provide 30 billion cubic meters of natural gas to the country every year, alleviate the contradiction between domestic natural gas supply and demand, reduce carbon emissions, and improve environmental quality. The construction of the railway project is of great significance for transporting sulfur from the processing plant, greatly reducing product transportation time and logistics costs.
Participated in the construction project: Responsible for the completion documentation of the new railway (Phase II) project;
We are honored to participate in the construction of the new railway (Phase II) project from Farap Station to the first natural gas processing plant in the Bagtyjiarlyk contract area on the right bank of the Amu Darya River in Turkmenistan, which is under the responsibility of China Petroleum Engineering Construction Co., Ltd. In this cooperation, we mainly undertook the outsourcing work of the engineering completion data project, and assisted in the smooth completion of the project with efficient and accurate services. Yuehong Energy Technology Company will continue to uphold the spirit of professionalism and provide high-quality solutions for domestic and foreign energy projects.
China Petroleum Engineering Construction Co., Ltd. highly praised the performance of Yuehong Energy Technology Company in the construction of the new railway (Phase II) project from Farap Station to the First Natural Gas Processing Plant. The Yuehong team demonstrated a high level of professional competence and dedication in the outsourcing work of the engineering completion data project. Their work was efficient and accurate, ensuring the integrity and quality of the project data. We are very satisfied with the services provided by Yuehong Energy Technology Company and look forward to more opportunities for cooperation in the future.